Category: house building

  • Snippets

    I am trying, during my two-week (16 days!) break this year to get ahead on a few household tasks as well as spend some time just doing the artsy-craftsy-teachery things I enjoy. The teacher-tasks are waiting until Thursday afternoon, when I will enjoy sitting down while watching football or movies and going through scope and sequence for the rest of the grading period. The artsy-craftsy tasks are mostly waiting until I have my office in better shape.

    The house is already cleaner and better organized than it has been since just after we moved in. I keep hoping for that “Open House” but now I think it is going to wait until Spring break… It’s all “baby steps” for now while I try to finish the last organizational and decorating tasks and wait for the funds for additional enhancements.

    Here is something Grant helped me put up today:

    A gift from Mother (one of two limited-edition ornaments) this year.
    A gift from Mother (one of two limited-edition ornaments) this year.

    This is a “completed” task (but need to clean the windows properly before taking more pics).

    Here is a “before” shot of the desk in my office/studio. At the time of writing, the surface is clear, but the shelving isn’t yet properly mounted. This is one of several tasks I have been needing to attend to for several months, and one that is finally going to get done!

    The desk is three feet deep and five feet wide.  The surface in this picture is covered in months of additions waiting for their homes.  Some of them belong on the shelves that are about to be mounted above, others will go in files in the cabinet to the left.  The small set of drawers and the sewing machine under the window have already been moved out, increasing the floor space by over 8 square feet!
    The desk is three feet deep and five feet wide. The surface in this picture is covered in months of additions waiting for their homes. Some of them belong on the shelves that are about to be mounted above, others will go in files in the cabinet to the left. The small set of drawers and the sewing machine under the window have already been moved out, increasing the floor space by over 8 square feet!

    The house is definitely looking lived-in… now the trick is going to be getting the last remnants of construction and the last bits of demolition debris removed before Spring. Planting time is coming soon and the ground is not yet prepared. I will be putting some bulbs in pots this week, and the rest…

    There is always another season, another year, another project. Here’s to seeing what 2015 will bring!

© 2005-2024 Stidmama All Rights Reserved -- Copyright notice by Blog Copyright